University of Washington Alaska Airlines Field at Husky Stadium was recently renovated with a replacement synthetic turf system using a design-build alternative delivery process to speed up design and installation. The existing synthetic turf was removed, the existing aggregate subgrade re-graded, the existing and new storm drainage infrastructure was cleaned and updated, and a new padding system was installed and capped with new infill. Sanderson Stewart was a part of the design-build team and worked with the turf contractor on design and construction document drawings related to the storm drainage, potable water access points, and new padding system that was installed over the existing base.
Our team is well versed in NCAA standards and requirements having worked on turf projects for university campuses across the West including most recently Montana State University, University of Washington, Northwest Nazarene University, and Western Washington University. Is your campus ready for synthetic turf or turf replacement? Reach out, we’re here to answer all your questions.
*Photo courtesy of Coast to Coast Turf
Recent Comments