• 1

Project Introduction and Background

This corridor study will examine the proposed corridor from the terminus of Skyway Drive and Alkali Creek to Highway 3. The study will evaluate the challenges of the proposed roadway, develop an access plan that will include bike/pedestrian infrastructure, storm water management strategies and evaluate future impacts to the corridor by new development activity. Drafting of the study will include community and stakeholder input. This project consists of a planning study only at this time. Design and construction would be a future project.

 

Project Updates

  • An updated draft of the summary report is now available here: Summary Report Draft

  • The second and final public meeting was held last night at Parmly Library. Thanks for all that attended and provided feedback on the project! We will be accepting additio

  • The draft corridor study report has been revised to address comments received from the project oversight committee and the MPO. The updated report can be found via Docume

  • Public Meeting #2 has been schedule for 6:00 PM on Thursday, March 5 in the Community Room at Billings Public Library.

Comments are closed.